Andersen, T and Gaarslev, T (1996) Perspectives on artificial intelligence in the construction industry. Engineering, Construction and Architectural Management, 3(01), 3-14.

Day, A K (1996) The Maquette, the model and the computer: organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(01), 15-28.

Holt, G D, Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and Latham: the contractors' view. Engineering, Construction and Architectural Management, 3(01), 97–115.

  • Type: Journal Article
  • Keywords: contract; contractor selection; Latham; procurement; tendering
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/eb021025
  • Abstract:

    The procedural and administrative aspects of UK tendering have remained largely unaltered for decades but this may soon change in light of the recent review of the construction sector, headed by Sir Michael Latham. This paper presents findings of a nationwide survey of UK construction contractors assessing their opinion of the Latham procurement recommendations, along with their opinion of the authors’ proposals for alternative selection procedure. Contractor usage/opinion of current tendering methods, tendering documentation and contractual arrangements are also identified. Analysis techniques primarily involve the derivation of contractor preference, agreement and importance indices (Pri. Agi and Imi respectively). Results show that clients are attempting to cut costs by increased use of open tendering coupled with plan and specification tender documentation, but that savings are offset by clients ultimately paying for contractors’ costs associated with their achieving contract award for only 1 in 5 bids. Generally, contractors are in tune with the ideals of the Latham review and characteristics pertaining to the HOLT (Highlight Optimum Legitimate Tender) selection technique.

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(01), 133-45.

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(01), 69-81.

Matthews, J, Tyler, A and Thorpe, A (1996) Pre-construction project partnering: developing the process. Engineering, Construction and Architectural Management, 3(01), 117-131.

Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(01), 29-46.

Naoum, S G and Hackman, J (1996) Do site managers and the head office perceive productivity factors differently?. Engineering, Construction and Architectural Management, 3(01), 147–60.

Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(01), 83-95.